EPM Live Release Notes v7.1.3

Introduction

We are happy to share the release notes for the EPM Live version 7.1.3.

Release Overview

The EPM Live v7.1.3 release is focused on fixing issues reported by customers in previous releases as well as internally reported issues. In order to provide the highest quality in our releases, each release is tested to the best of our ability.

Release Date: November 2, 2019

Release Type: Generally Available

Deliverables:

  • EPM Live installer
  • Release Notes Documentation

Summary of Issues and Improvements

Issues Fixed in v7.1.3

The following defects are addressed in the release:

  • Corrected rejected timesheet email content (SKYVERA-2887).
  • Fixed occasional hour mismatching in Task Plan (SKYVERA-2231).
  • Resolved an issue when resource duplicate was unable to delete due to linked work records (SKYVERA-4695).
  • Fixed layout issues shown in a project screen after big project updates (SKYVERA-4982).
  • Fixed an issue resulting in "CURRENCY FIELD CONTAINS INVALID DATA" error if baseline fields were corrupted (SKYVERA-2897).
  • Fixed resource addition to favourites in Resource pool under User management (SKYVERA-2564).
  • Resolved an error while opening the default planner from the Project Edit plan page (SKYVERA-2956).
  • Fixed creation of new field while editing Summary Row field Calculation (SKYVERA-4960).
  • Fixed Project planner Grid filters (SKYVERA-6746, SKYVERA-6747, SKYVERA-6706).
  • Fixed new Planner addition in Settings (SKYVERA-4094).
  • Fixed opening issues of Resource analyzer (SKYVERA-2955).
  • Updated error messages related to project invitations (SKYVERA-2349).
  • Restored Edit and Delete buttons in the Resource tab (SKYVERA-3096).
  • Added task start date checker to Project planner (SKYVERA-839).
  • Fixed issues with Planner reopening after granting permissions (SKYVERA-4095).
  • Resolved loading issues on the Resources page (SKYVERA-3083).
  • Fixed an error when adding an attachment to a task (SKYVERA-3204).

Improvements in v7.1.3

Timesheet submission time has improved by a factor of eight (SKYVERA-8685).

Known Issues

  • Project publishing notifications not triggering updates (SKYVERA-1021).
  • Project drop-down list can take a long time to load with numerous items (SKYVERA-2307).
  • Long text field data may be truncated in SSRS reports (SKYVERA-4978).
  • Occasional updates to the Project Center not reflecting changes (SKYVERA-4424).
  • Cost import through CSV not updating project items outside the default project center (SKYVERA-4501).
  • Error restoring a resource from the Recycle bin (SKYVERA-5699).

System Requirements

The following software requirements apply:

  • Operating System: Windows Server 2012 R2 with .NET Framework 4.5
  • SharePoint: SharePoint 2016
  • Database: MS SQL 2016 Standard
  • Web Browser: IE 11, Chrome 72.0.3626.121
  • Microsoft Project: 2016, 2013

Installation or Upgrade Instructions

Instructions for installing or upgrading EPM Live remain unchanged from prior releases. Ignite Technologies recommends that you work with EPM Live Professional Services and/or your Account Manager for assistance.

Release Notes

EPM Live Release Notes v7.1.3

Comments

0 comments